"1647 Nevada Inclined Spillway Tunnel leading down into Diversion Tunnel No. 1. September 28th, 1932.
1515 Building fill, Arizona side, on which Tail Towers of Cableway No. 5 and No. 6 will run. August 29th, 1932.
1623 Arizona side of Cableway No. 5 and No. 6, showing work on anchorages for Tail Tower Track. September 22nd, 1932."
black and white photographs 4 x 5.3 in. or 8 x 4.8 in. paper background 10 x 13.5 in.
Digital Format
TIFF/JPG/PDF
Digitization Specifications
Archived TIFF images were scanned by Jill Walker at 400 dpi with an Epson Expression 10000XL scanner. Digital images were reformatted in Photoshop. JPG and PDF files were then created for general use.
Digital Image Copyright 2008. Materials may be used for non-profit and educational purposes, please credit the Special Collections Department, Stewart Library, Weber State University.