"1885 View of wooden form for concrete lining in the 18-foot Penstock Branches. January 26th, 1933.
1888 View of yard for the manufacturing of porous drain tiles in the Spillways. January 26th, 1933.
1898 Hi-Mix Concrete Plant and mixers transported ready for placing. January 27th, 1933.
1908 Invert concrete in the Inclined Spillway Tunnel, at its junction with #1 Diversion Tunnel. January 30th, 1933."
black and white photographs 4 x 5.3 in. or 8 x 4.8 in. paper background 10 x 13.5 in.
Digital Format
TIFF/JPG/PDF
Digitization Specifications
Archived TIFF images were scanned by Jill Walker at 400 dpi with an Epson Expression 10000XL scanner. Digital images were reformatted in Photoshop. JPG and PDF files were then created for general use.
Digital Image Copyright 2008. Materials may be used for non-profit and educational purposes, please credit the Special Collections Department, Stewart Library, Weber State University.